RWF/W/25-26/19 dtd. 14.01.2026
5
Infrastructure works of SW-I : New Forge Line Forging Bay- Bloom Storage and the relocation of existing Road to BAFL, SW-II: Extension of Axle Forging Heat Treatment Bay and Development of connection to relocated road from Wheel Shop main road/weigh bridge and SW-II: Improvement of road surface inside material gate and wheel shop roads.
0.0
1.828173146E8
1064100.0
15-01-2026
15-01-2026
06-02-2026
15-01-2026
06-02-2026
—
Infrastructure works of SW-I : New Forge Line Forging Bay- Bloom Storage and the relocation of existing Road to BAFL, SW-II: Extension of Axle Forging Heat Treatment Bay and Development of connection to relocated road from Wheel Shop main road/weigh bridge and SW-II: Improvement of road surface inside material gate and wheel shop roads.
—
No tender documents available.
No corrigendum available.
No award document available.
Dy.CHIEF ENGINEER
Office of the PRINCIPAL CHIEF ENGINEER Rail Wheel Factory Yelahanka Bangalore 560064